1
0
Fork 0
Commit Graph

24 Commits (main)

Author SHA1 Message Date
Jeff Moe 41de669821 Reorder pics for clarity 2022-11-03 15:08:16 -06:00
Jeff Moe ec5cdfa049 Update harness to v2 2022-11-03 14:44:58 -06:00
Jeff Moe 334119dbe9 Harness rotator EL 2022-11-03 14:42:24 -06:00
Jeff Moe f1976df368 harness rotator AZ 2022-11-03 14:38:09 -06:00
Jeff Moe 7d22021ded Main EL harness 2022-11-03 14:15:08 -06:00
Jeff Moe 1e13a1168e Main AZ harness 2022-11-03 14:12:17 -06:00
Jeff Moe 1d16689316 Correct diagram linky 2022-10-31 13:56:27 -06:00
Jeff Moe c5e6981f2f V2 draft harness controller az 2022-10-31 13:55:14 -06:00
Jeff Moe 6923287b9e harness v2 draft 2022-10-31 13:46:34 -06:00
Jeff Moe 730f86a3bb Cable img, harness changes 2022-10-10 16:44:44 -06:00
Jeff Moe 8880204bf0 Green Heron RT-21 Az/El front panel pic 2022-10-08 14:42:13 -06:00
Jeff Moe a0c72bc4e5 Green Heron RT-21 Az/El back panel pic 2022-10-08 14:37:38 -06:00
Jeff Moe 7a21c45237 Clarify (?) diagrams 2022-10-06 20:18:54 -06:00
Jeff Moe 4619101074 Put connecting harness next to each other 2022-10-06 20:17:58 -06:00
Jeff Moe 7e68d08d46 Flip controller harness. Match teh colorz 2022-10-06 20:17:02 -06:00
Jeff Moe be75a533c4 Elevation Controller Harness pic 2022-10-06 19:00:29 -06:00
Jeff Moe 622cfdf118 Arrrrrrrrrr 2022-10-06 18:54:45 -06:00
Jeff Moe c6a1d8a357 Diagram of the azimuth controller harness pic 2022-10-06 18:52:57 -06:00
Jeff Moe 5b617f16ce Elevation Rotator Harness wireviz pic 2022-10-06 18:33:27 -06:00
Jeff Moe 8dc5f63773 Actual diagram 2022-10-06 18:17:24 -06:00
Jeff Moe 9547d4af24 Wireviz Az rotator harness diagram pic 2022-10-06 18:16:26 -06:00
Jeff Moe 425ae81e7c No Yaesu 2022-10-06 13:46:36 -06:00
Jeff Moe b8ab1c82b1 Green Heron RT-21, Alfa Spid RAS pic 2022-10-06 13:45:15 -06:00
Jeff Moe 39987266fc Mighty Satellite Ground Station 2022-10-05 13:14:40 -06:00